After floor repair. Ceramic tile backer installed.

After floor frame repair, 1/4" cement board on the top of 3/4" CDX plywood was installed. Starts to look like a bathroom again. New toilet flange will go into clean cut hole, and connected to 3" drain. Air conditioning vent have to be repaired and sealed. New trim register coming on the top, after tiles are in place.


copyright  Expert Plumbing Service 2013